Stressing & Detensioning

Stressing

Detensioning Equipment:

After the concrete has achieved 80 % of it’s specified final strength, then the stretching force can be transferred onto the elements. For this, the lifting jack and the motor driven pump unit is used to lift the stress bend, the support shells are removed, and thereafter strain is taken off the lifting jacks until the stretching force is totally transferred onto the concrete elements.p