Detensioning Equipment:
After the concrete has achieved 80
% of its specified final strength, then the stretching force
can be transferred onto the elements. For this, the lifting jack
and the motor driven pump unit is used to lift the stress bend,
the support shells are removed, and thereafter strain is taken off
the lifting jacks until the stretching force is totally transferred
onto the concrete elements.p |
 |