The storing area should be
located right behind the production area.
The cut-to-size concrete
elements are lifted by the main traveling overhead crane off the
forming bed by means of special grabbing tongues and lifting beams
and brought to the storage area. Alternatively, the elements are
placed on carts and pulled to the storage area by a fork lift or
tractor.
weiler offers various options
for the transportation of the elements |